When to call a new restaurant about signage: the Washington timeline
Washington restaurants order their sign once the build-out permit is issued: about five months before opening.
Median Middle half of openings Sign order window
* fewer than 30 openings; treat as a rough guide.
When the decision happens
A sign needs its own permit, fabrication time and an install date before opening. Owners start on it once the build-out permit is approved and the landlord’s sign rules are settled.
Call after the permit is issued. By the time the business license shows up, there is not enough time to permit, build and hang a new sign.
What the owner is dealing with
A second permit to wait on
Most cities review sign permits separately from the build-out. Owners usually learn that late.
Landlord sign criteria
Shopping centers and mixed-use buildings set sign size, lighting and mounting. A shop that reads the criteria first saves a redesign.
Opening under a banner
A sign that misses opening day means a vinyl banner through the weeks with the most walk-in traffic.
Questions reps ask
When does a new restaurant order its sign? After the building permit is issued, once the space and the landlord’s rules are settled. In Washington that is about five months before opening.
Is a sign permit a good lead on its own? It is a late one. A filed sign permit usually means the sign is already designed and ordered. The building permit comes earlier.
How far ahead do I need to reach them? Far enough to permit, build and install. The business license, which shows up within about five weeks of opening, is usually too late.
How we measured this
Measured from 402 Washington restaurant openings, January 2024 to October 2026 (339 King, 42 Pierce, 21 Snohomish): every restaurant in King, Pierce and Snohomish Counties whose city business license gave an open date in that range. Opening day is the open date on the license. For each step we took the first matching public record on the same business in the two years before opening (for the first inspection, the 180 days after) and counted the days between.
A step counts only when the record is tied to the business itself. Permits filed under a bare address are left out, because a hand check found earlier tenants' permits among them. That leaves the permit steps with 4 to 20 openings each, so they carry an asterisk. Three steps only see records since we started reading them (dates below), so their numbers are bounded: the business license can show at most a few months of lead, and the first inspection leaves out recent openings not yet inspected. Measured October 4, 2026. We re-measure as more permits are tied to their businesses.
| Step | Openings | Share of 402 | Middle half (days) | Median (days) |
|---|---|---|---|---|
| Building permit filed* | 20 | 5.0% | 345 to 81 | 164 |
| Building permit issued* | 14 | 3.5% | 284 to 108 | 142 |
| Liquor license application* | 8 | 2.0% | 75 to 34 | 55 |
| Building permit finaled* | 4 | 1.0% | 56 to 39 | 49 |
| Health plan review filed* | 2 | 0.5% | 50 to 33 | 41 |
| Business license filed | 65 | 16.2% | 32 to 4 | 9 |
| First health inspection | 60 | 14.9% | 43 after to 107 after | 76 after |
- Building permit filed. Building, alteration or trade permit application at the city or county (Seattle, Tacoma, Everett, Bellevue, Kirkland, Burien, Pierce County and others).
- Building permit issued. The same permits on the day the city issued them.
- Liquor license application. Washington State Liquor and Cannabis Board new-license application notices. We have these from March 2026, so this step only sees recent openings.
- Building permit finaled. The building permit marked final or complete by the city.
- Health plan review filed. Snohomish County Health Department food plan review, the one county whose plan review dates we read today.
- Business license filed. A city business license filed ahead of its stated open date, dated the day it first appeared in the city record. Seen from June 2026.
- First health inspection. The first King County routine food inspection on or after opening day. Inspection records start in December 2025.