How to find new restaurants opening in Chicago (public sources)

Chicago puts nearly every record that comes before a restaurant opening on one open data portal. Here is what each record shows, the order they arrive in, and the filters that turn them into a weekly list.

From July through September 2026, the City of Chicago issued 244 new Retail Food Establishment licenses. Each one has a date, an address, and a business name, and it is published on the City's open data portal, along with the health inspection that came before it and many of the building permits behind the build-out. If you sell to restaurants in Chicago, that is a free prospect list that updates every day. The work is reading it in the right order.

Here are the four public records, earliest to latest, what each one tells you, and how to pull it yourself. (For the general version of this method, outside any one city, see how to find new businesses opening.)

Where the records live

Three of the four sit on data.cityofchicago.org, the City's Socrata portal. Each has a web table you can filter and an API you can save as a query:

The fourth is the state: the Illinois Liquor Control Commission's license lookup.

1. Building permits: earliest, and the vaguest

The build-out has to happen before anyone can inspect it, so permits come first. In the Building Permits dataset, filter permit_type to PERMIT - RENOVATION/ALTERATION or PERMIT - NEW CONSTRUCTION and search work_description for food words. In the third quarter of 2026, 70 permits issued in Chicago mentioned "restaurant" in the description.

Two limits. The description rarely names the tenant, and the contacts listed on a permit are usually the contractor, the architect, and the building owner, not the restaurant. Keep the address and the reported_cost (it tells you how big the job is), and wait for a later record to put a business name on that address. The City's building records lookup shows the full permit history for one address.

2. The license inspection: the record closest to opening day

Chicago will not issue a retail food license until the space passes a public health inspection, according to the City's Retail Food Establishment license page. In the Food Inspections dataset, those visits are the rows where inspection_type is License, or License Re-Inspection for a return visit. The results column tells you how close the place is.

In the third quarter of 2026, CDPH ran 632 license inspections. 378 passed (312 outright, 66 with conditions), 112 failed, 131 came back "Not Ready", and 11 were "No Entry".

  • Pass or Pass w/ Conditions: the license is close. For the 239 new food licenses issued that quarter with a passing license inspection on record, the median gap from the pass to the license was 10 days.
  • Not Ready or Fail: the owner has applied for the license and the inspector has been out, but the space is not finished. A re-inspection follows. These places are still weeks out: across the quarter's new food licenses, the median gap from the first license inspection, whatever its result, to the license was 18.5 days.

The license_ column carries the license number, which matches license_number in Business Licenses. That join is how you tell a passed inspection that is still waiting on its license from one that already has it. Nearly every new license has an inspection to join to: 240 of the quarter's 244 new food licenses had a license inspection on record.

3. The business license: filter for ISSUE

In Business Licenses, filter license_description to Retail Food Establishment and application_type to ISSUE. Leave out RENEW: those are existing places renewing a license that runs on a two-year term. In the third quarter of 2026 there were 1,046 renewals against the 244 new issues, so skipping this filter buries the openings four to one.

Every new food license we pulled for the quarter already carried an issue date, and license_start_date almost always matches it. Read it as "opening now". The median wait from application_created_date to date_issued was 41.5 days, and a quarter of licenses took longer than about three months, so the application date tells you how long the owner has been at it.

A new license is not always a new business. When we checked recent ISSUE rows against the real world, we found takeovers, relocations, and places that had been open for a year or more under the same name. Before you call, search the same dataset for earlier food licenses at that address. A prior license there, especially under a similar name, points to a takeover or a re-license, and that owner probably has most of the vendors you sell against already.

City liquor licenses live in the same dataset. A restaurant that serves alcohol needs a Consumption on Premises - Incidental Activity license; bars need a Tavern license. In the third quarter of 2026 the City issued 58 new consumption-on-premises licenses and 3 new tavern licenses. Per the City's liquor license classes page, these carry extra inspections, a criminal history review, and a public notice, so they take longer. A new food license and a new liquor license on the same account usually means a full-service room with a bar program.

4. The Illinois liquor license: confirmation, not discovery

The state license comes after the city one: the ILCC retailer application instructions ask for the local liquor license number and the date it was issued. The ILCC license lookup lets you search active licenses and download the full active list, but that list is a roster of everyone licensed today. It does not mark which licenses are new. Use it to confirm a business name or its corporate entity, not to find openings.

A weekly routine that takes about an hour

  1. Pull the last seven days of license inspections, every result. A saved query looks like this:
    https://data.cityofchicago.org/resource/4ijn-s7e5.json
      ?$where=inspection_type like 'License%'
         AND inspection_date > '2026-11-13'
  2. Look up each license_ in Business Licenses. Issued: the place is opening now. Not issued yet: it is days to a few weeks out.
  3. Search the address for earlier food licenses to catch takeovers.
  4. Check Building Permits at the same address to size the build-out.
What it costs you: nothing to access, an afternoon to set up, and an hour or so a week to keep up. If you script it, the City's API slows anonymous bursts of requests, so register an app token and space your calls.

The takeaway

In Chicago the license inspection is the record to watch. It names the business, it lands days to weeks before the doors open, and its result tells you whether the owner is still building or about to start trading. Join it to the license data, rule out takeovers by address, and you have a short, dated list every Monday. Where that fits in the wider sequence of permits and licenses is laid out in the restaurant opening timeline.

Counts are from City of Chicago open data for July 1 to September 30, 2026, queried October 3, 2026. This site provides applications using data that has been modified for use from its original source, www.cityofchicago.org, the official website of the City of Chicago. The City of Chicago makes no claims as to the content, accuracy, timeliness, or completeness of any of the data provided at this site. The data provided at this site is subject to change at any time. It is understood that the data provided at this site is being used at one's own risk.